CARE OF WORK:
The Contractor shall be responsible for all damages to persons or property that occur as a result of his fault or negligence in connection with the prosecution of the work and shall be responsible for the proper care and protection of all work performed until completion and final acceptance, whether or not the same has been covered in whole or in part by payments made by the City of Ocala.
The Contractor shall avoid damaging sidewalks, streets, curbs, pavements, utilities, structures or any other property (except that which is to be replaced or removed) either on or adjacent to the site. He shall repair, at his own expense and in manner satisfactory to the City of Ocala, any damage thereto caused by his operations.
All water and gas mains, all sewer and other pipes, and all conduits and other underground work of any nature, crossing or projecting into any trench or excavation and all appurtenances thereto, such as Cast Iron Valve Boxes, curb boxes, manhole casting, etc., shall be sufficiently and adequately shored and supported by timber and planking and protected by the Contractor from injury, and any damage or injury thereto shall be repaired by the Contractor at his own expense to the satisfaction of the Engineer.
|
ADA NEEDS: Please call the procurement professional shown on this listing forty-eight (48) hours in advance so arrangements can be made if reasonable accommodations are needed for you to participate in any meeting.
|
AWARDED CONTRACT FAILURE - BIDDING SUSPENSION I understand and agree to the following: Bidders who submit a bid to the City of Ocala and fail to fulfill the contract term, for any reason, will be subject to future bidding suspension for year (1), and up to a possible three (3) year bid debarment for serious contractual failures. Owner/Authorized Company Representative initials:
|
The City reserves the right to re-open bidding for a Best-and-Final offer.
|
BIDDER CONTRACTS: Bidder contracts/agreements will not be accepted in most cases. If a contract is required, only City of Ocala contracts will be used for all goods and services. The requirement of bidder contracts and/or bidder written terms and conditions may result in bid rejection. The City will consider adding appropriate bidder clauses into our contract; please upload any desired clauses with your solicitation response.
|
CLARIFICATIONS AND CORRECTIONS: The City of Ocala reserves the right, where it may serve the City’s best interest, to request additional information or clarifications from bidders/proposers, or to allow corrections of errors or omissions.
|
CITY OF OCALA STANDARD SPECIFICATIONS FOR CONSTRUCTION (EFFECTIVE FEBRUARY 16, 2023): For this project, the Contractor will be bound by these specifications and conditions: STANDARD SPECIFICATIONS FOR CONSTRUCTION OF STREETS, STORMWATER, TRAFFIC, WATER AND SEWER INFRASTRUCTURE: Standard Specifications for Construction (Effective: 02/16/2023)
|
CONFIDENTIAL, PROPRIETARY, OR TRADE SECRET MATERIAL: Bids or quotes received by the City pursuant to its solicitations are exempt from public disclosure until such time that the City provides notice of an intended decision or until thirty (30) days after opening the bids or quotes, whichever is earlier. If the City rejects all bids or quotes pursuant to this solicitation and provides notice of its intent to reissue the solicitation, then the rejected bids or quotes remain exempt from public disclosure until such time that the City provides notice of an intended decision concerning the reissued solicitation or until the City withdraws the reissued solicitation. A bid, quote, or reply shall not be exempt from public disclosure longer than twelve (12) months after the City's initial notice rejecting all bids, quotes, or replies. ANY MATERIAL SUBMITTED IN RESPONSE TO THIS SOLICITATION WILL BECOME A PUBLIC RECORD PURSUANT TO CHAPTER 119, FLORIDA STATUTES. THIS INCLUDES MATERIAL WHICH THE RESPONDING BIDDER MAY CONSIDER TO BE CONFIDENTIAL, PROPRIETARY, OR A TRADE SECRET. ANY CLAIM OF CONFIDENTIALITY SHALL BE WAIVED UPON SUBMISSION, EFFECTIVE AFTER OPENING PURSUANT TO CHAPTER 119, FLORIDA STATUTES. Owner/Authorized Company Representative initials:
|
CONFLICT OF INTEREST: Disclose the name(s) of any employee, officer, director, shareholder, or agent of your firm that is also a City of Ocala employee or public official: Disclose the name(s) of any City of Ocala employee or public official that is a known relative of an employee, officer, director, shareholder, or agent of your firm: Failure to disclose known conflicts of interest may result in bid rejection and/or contract termination, if awarded. City of Ocala employees who have a 5% or more interest in a bidder's firm must also complete an "Officer and Employee Disclosure Statement" which can be obtained at www.bidocala.com under Vendor Resources. This form includes instructions and relative Florida statutes. Failure to complete this form, if applicable, may result in bid rejection.
|
CONTRACTOR’S EMPLOYEES: The foreman, employees, mechanics and other employed by the Contractor shall be skilled in the work given to them to do. Any employee of the Contractor who may use profane or abusive language to the Engineer or any Inspector, or otherwise impede or embarrass him in the performance of his duties, or who obstructs the progress of the work, shall upon the request of the Engineer, be immediately discharged and not again employed without consent of the Engineer. In doing any work contemplated by this contract, eight (8) hours shall constitute a legal day’s work by any laborer or workman employed by said Contractor hereon.
|
CONTRACT WORK HOURS AND SAFETY STANDARDS: 40 U.S.C. §§ 3701-3708, 29 C.F.R. part 5 The Contract Work Hours and Safety Standards Act apply to all FTA funded contracts in excess of $100,000 that involve the employment of mechanics or laborers. These requirements extend to all third party contractors and their contracts at every tier and sub-recipients and their subcontracts at every tier. Contract Work Hours and Safety Standards: For all contracts in excess of $100,000 that involve the employment of mechanics or laborers, the Contractor shall comply with the Contract Work Hours and Safety Standards Act (40 U.S.C. §§ 3701-3708), as supplemented by the DOL regulations at 29 C.F.R. part 5. Under 40 U.S.C. § 3702 of the Act, the Contractor shall compute the wages of every mechanic and laborer, including watchmen and guards, on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. § 3704 are applicable to construction work and provide that no laborer or mechanic be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchase of supplies or materials or articles ordinarily available on the open market, or to contracts for transportation or transmission of intelligence. In the event of any violation of the clause set forth herein, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, the Contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of this clause in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by this clause. The FTA shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal contract with the same prime Contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime Contractor, such sums as may be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in this section. The Contractor or subcontractor shall insert in any subcontracts the clauses set forth in this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime Contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in this agreement. Contract Work Hours and Safety Standards for Awards Not Involving Construction: The Contractor shall comply with all federal laws, regulations, and requirements providing wage and hour protections for non-construction employees, in accordance with 40 U.S.C. § 3702, Contract Work Hours and Safety Standards Act, and other relevant parts of that Act, 40 U.S.C. § 3701 et seq., and U.S. DOL regulations, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction (also Labor Standards Provisions Applicable to Non-construction Contracts Subject to the Contract Work Hours and Safety Standards Act),” 29 C.F.R. part 5. The Contractor shall maintain payrolls and basic payroll records during the course of the work and shall preserve them for a period of three (3) years from the completion of the contract for all laborers and mechanics, including guards and watchmen, working on the contract. Such records shall contain the name and address of each such employee, social security number, correct classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. Such records maintained under this paragraph shall be made available by the Contractor for inspection, copying, or transcription by authorized representatives of the FTA and the Department of Labor, and the Contractor will permit such representatives to interview employees during working hours on the job. The contractor shall require the inclusion of the language of this clause within subcontracts of all tiers.
|
FINAL ESTIMATE FOR PAYMENT: After the Contractor has approved, or approved under protest, the Engineer’s final estimate, final payment will be processed based on the entire sum, or the undisputed sum in case of approval under protest, determined to be due the Contractor less all previous payments and all other amounts to be deducted under the provisions of the contact.
|
DELAYS AND DAMAGES: The Bidder agrees to make no claim for extra or additional costs attributable to any delays or inefficiencies in the performance of this contract occasioned by any act by the City except as provided in the agreement. The Bidder also agrees that any such delay or inefficiency shall be compensated for solely by an extension of time to complete the performance of the work in accordance with the provision in the standard specification.
|
INSPECTION AND ACCEPTANCE: All goods and/or services provided under the resulting agreement are subject to inspection and acceptance by an authorized representative of City. Payment shall not be authorized until the goods and/or services have been received, accepted, and properly invoiced. City reserves the right to have rejected goods replaced by Vendor at the purchase price stipulated in this Agreement; or to return the rejected goods for full credit at the price charged. Transportation costs and any additional costs will be borne by Vendor in each instance. City’s rights with respect to rejection of material are not waived by failure to notify Vendor immediately upon receipt of delivery.
|
PERFORMANCE EVALUATION: At the end of the service period, the City may evaluate vendor performance. This evaluation will become public record.
|
FLORIDA STATUTE 287.133: Public Entity Crime; denial or revocation of the right to transact business with public entities. Vendor on its behalf and its affiliates agrees and affirms that it has not been placed on the convicted vendor list following a conviction of a public entity crime as provided for in Section 287.133(2)(a), Florida Statutes, which states: a person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases or real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO, for a period of 36 months from the date of being placed on the convicted vendor list. Owner/Authorized Company Representative initials:
|
REFERENCES: References within the previous three years are preferred. REFERENCE #1 Company Name: Contact Person: Phone Number: Email Address: Date of Service:
| Loading… |
|
14 | 31 | 1 | 2 | 3 | 4 | 5 | 6 |
15 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
16 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
17 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |
18 | 28 | 29 | 30 | 1 | 2 | 3 | 4 |
19 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
to
| Loading… |
|
14 | 31 | 1 | 2 | 3 | 4 | 5 | 6 |
15 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
16 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
17 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |
18 | 28 | 29 | 30 | 1 | 2 | 3 | 4 |
19 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
Contract Value: Contract Details and/or Description:
|
REFERENCE #2 Company Name: Contact Person: Phone Number: Email Address: Date of Service:
| Loading… |
|
14 | 31 | 1 | 2 | 3 | 4 | 5 | 6 |
15 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
16 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
17 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |
18 | 28 | 29 | 30 | 1 | 2 | 3 | 4 |
19 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
to
| Loading… |
|
14 | 31 | 1 | 2 | 3 | 4 | 5 | 6 |
15 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
16 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
17 | 21 | 22 | 23 | 24 | 25 | 26 | 27 |
18 | 28 | 29 | 30 | 1 | 2 | 3 | 4 |
19 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
Contract Value: Contract Details and/or Description:
|
REQUESTED AND ADDITIONAL DOCUMENTS Upload any requested and additional documents here:
Max. File Size you can upload is: 50MB. *.exe files will not be accepted
|
REQUIRED LICENSES AND CERTIFICATIONS: My firm and/or sub-contractors can comply with the license and certification requirements in the scope and/or this listing. Vendor shall upload all licenses and/or certifications with their response and must submit required licenses and certifications immediately upon request from the City. Owner/Authorized Company Representative initials:
|
SAFETY AND ENVIRONMENTAL: Vendor will be responsible at all times for precautions to achieve the protection of all persons including employees and property throughout the resulting contract term. The Vendor shall make an effort to detect hazardous conditions and shall take prompt action where necessary to avoid accident, injury or property damage. EPA, DEP, OSHA, and all other applicable safety laws and ordinances shall be followed as well as American National Standards Institute Safety Standards. All hazardous spills, accidents, injuries or claims or potential claims shall be reported promptly to the City Risk Management Department at 352-401-3989, or cell 352-572-0414, and rdennis@ocalafl.org. Agrees to comply with the safety and environmental requirements above. Owner/Authorized Company Representative initials:
|
SOLICITATION DOCUMENTS: The City of Ocala (City) has no responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the official City links below: Bid Ocala: www.bidocala.com ProRFx Florida: www.florida.prorfx.com Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued.
|
CONTRACT TIME: Contractor agrees the work will be completed in 90 days after the Notice to Proceed (NTP) is issued.
|
SUBCONTRACTORS AND DBE GOALS: The bidder represents the subcontractors listed below are financially responsible and are qualified, insured, licensed, and certified to do the work required. The bidder will endeavor to use DBE/MBE subcontractors whenever possible. For non-grant funded projects, City of Ocala's goal is 15% as a race-neutral DBE goal. FDOT funded projects have a race-neutral DBE goal of 10.65%. The Ocala International Airport's DBE goal is 12%. SunTran's goal is 10.65%. DBE firms can be located via this directory: Florida Department of Transportation DBE Directory No subcontractors will be utilized. Our company will be utilizing more than two (2) subcontractors. Our list of subcontractors including percent of work is attached in the section labeled "REQUESTED AND ADDITIONAL DOCUMENTS." A fillable subcontractor list is available at: Subcontractor List Bidder/Prime must perform a minimum of 30% of the work with their own forces unless specified differently in the Scope of Work. NOTE: Bidder/Prime not providing an accurate, good faith estimate of subcontractor percent (%) of work may have their bid rejected.
|
SUBCONTRACTOR #1
|
Company Name: Work Category: City, State: DBE MBE
|
Percent of Work: %
|
SUBCONTRACTOR #2
|
Company Name: Work Category: City, State: DBE MBE
|
Percent of Work: %
|
CONDITIONS UNDER WHICH LIQUIDATED DAMAGES ARE IMPOSED: If the Contractor or, in case of their default, the surety fails to complete the work within the time stipulated in the solicitation, or within such extra time the City may have granted when the Contractor or, in case of their default, the surety shall pay to the City, not as a penalty, but as liquidated damages, the amount of $ 100 per day for each day of delay.
|
WARRANTY ON LABOR AND MATERIALS: Warranty on Labor: Calendar Days Warranty on Materials: Calendar Days
|